CHINESE JOURNAL OF COMPUTATIONAL PHYSICS ›› 1997, Vol. 14 ›› Issue (2): 221-226.

Previous Articles     Next Articles

BURNUP CALCULATION OF 200MW INERTIAL CONFINEMENT HYBRID REACTOR

Liu Zhongxing, Wu Jun, Huang Wengkai, Lu Xun, Ren Jie, Zeng Wenping   

  1. Institute of Applied Physics and Computational Mathematics P. O. Box 8009, Beijing 100088, P. R. China
  • Received:1996-04-06 Revised:1996-08-26 Online:1997-03-25 Published:1997-03-25

Abstract: A proposal of 200MW Inertial Confinement Fusion Fission Hybrid reactor which does not produce plutonium is presented on the basis of one dimensional discrete ordinate transport calculation and burmup calculation by using code BISON 1.5[4].The time dependent results of energy deposit,238U(n,γ),239Pu(n,α),6Li(n,α) reac-tion rates and Keff are given.Such a novel reactor proposed here not only could maintain high output power but also could keep critical safety.

Key words: Inertial confinement, Fusion fission Hybrid reactor, critical safety

CLC Number: